The First Two Weeks After Delivery

Why a slab should sit in the room before you cut it, how to stack it, and what to watch for.

Delivery in Europe5 min readUpdated 2026-10-23

The slab arrives kiln dried to 8 to 10 percent. That does not mean it is at equilibrium with your house. It has come from a workshop, through a lorry, to a room that may be drier or damper than either. Before it is cut, flattened or finished, it needs to stop changing.

This step costs nothing but time, and skipping it is the most expensive mistake in the whole process, because everything you do afterwards is built on a shape that is still moving.

What to do the day it arrives

  1. Inspect it before you sign. Five minutes, with photographs. See what to check when the pallet arrives.
  2. Unwrap it fully. Any plastic left on traps moisture against the wood. Take it all off.
  3. Get it into the destination room. Not the garage, not the hall. The room where the finished piece will live, because that is the climate it has to match.
  4. Lay it flat on stickers. See below.
  5. Leave it alone.

How to stack it

This is the part that decides whether the slab stays flat.

  • Flat, never on edge. A slab leaning against a wall for two weeks will take a bow, and you will have to machine it out of the thickness you paid for.
  • On stickers every 40 to 50 cm. Stickers are strips of scrap wood, all the same thickness, laid across underneath. They let air reach the underside so both faces dry and settle at the same rate.
  • Stickers aligned vertically if you have more than one slab stacked. A sticker that is out of line puts a point load into the board above and presses a bend into it.
  • Off the floor, especially a concrete floor, which is colder and damper than the air above it.
  • Away from the radiator, the heat pump outlet and direct sun. Local dry heat dries one area faster than the rest, and that difference is what tears wood.
The one rule

Both faces must be able to breathe equally. Any slab lying directly on a floor, a sheet of plastic or another slab is drying from one side only, and it will cup.

How long

Two weeks is the minimum. Four is better. Longer if:

  • It arrived in deep winter into a heavily heated house, when the gap between workshop and room is largest.
  • The slab is 7 cm or thicker, because thick stock equalises more slowly.
  • It has been stored somewhere unheated at any point in its journey.

You are not waiting for it to dry further. You are waiting for it to stop changing.

How to know when it is ready

Measure, do not guess. Take a moisture reading on arrival, note it with the date, and read the same spots every few days.

When two readings a week apart are the same, the slab has reached equilibrium with the room and you can start work. If the number is still falling, wait. The method is in what 8 to 10 percent moisture content means.

A cheap moisture meter pays for itself on a single slab.

What you might see, and what it means

What happensWhat it means
Existing end checks open slightlyNormal. The ends lose moisture fastest. You are trimming them off anyway
A slight cup appearsUsually uneven airflow. Check the stickers, flip the slab, give it another week
Surface looks greyer or dullerNormal for rough-sawn wood sitting in a room. It disappears at the first pass of the planer
A new split well inside the boardNot normal. Photograph it, note the date and tell us
Nothing visible at allThe usual outcome, and the one you want

Then keep the habit

The settling does not end when the table is built. The first full heating season is when a solid top does most of the moving it will ever do. Fix it so it can move, and keep the room out of extremes. See how a slab moves through the year and attaching a slab top so it can still move.

Common questions

How long should a wood slab acclimate before building?

Two weeks as an absolute minimum, four weeks preferably, and longer for thick stock or a slab delivered in midwinter. Confirm with a moisture meter rather than by the calendar.

Can I store a slab standing on edge?

No. Standing a slab on edge for any length of time lets it bow under its own weight, and you then lose thickness machining the bow out. Always flat, on evenly spaced stickers.

What are stickers and why do I need them?

Strips of scrap wood of equal thickness laid across underneath the slab every 40 to 50 cm. They lift it so air reaches both faces equally, which is what stops it cupping.

Can I acclimatise the slab in my garage?

Only if the garage has the same climate as the room the finished piece will live in, which is almost never true. An unheated garage is far damper than a heated room, so the slab will simply have to settle again indoors.

Measured before it ships

Each slab goes out with its moisture reading so you know exactly what is arriving, and where it should land once it is in your room.

See slabs in stock