How Long a Slab Build Really Takes
Working time against waiting time, because most of the schedule is the finish curing and the wood settling.
People ask how long it takes to build a slab table and expect an answer in hours. The working time is a weekend. The schedule is six to eight weeks, because most of it is waiting for wood to settle and finish to cure.
The two clocks
| Stage | Working time | Elapsed time |
|---|---|---|
| Quote and order | Minutes | Quote within a day |
| Delivery | None | 3 to 7 days once shipped |
| Acclimatising | An hour to set it up | 2 to 4 weeks |
| Flattening | 3 to 6 hours, or a workshop visit | 1 day, or a week if outsourced |
| Cutting and edge prep | 2 to 4 hours | 1 day |
| Sanding | 3 to 5 hours | 1 day |
| Finishing, 2 to 3 coats | 1 to 2 hours per coat | 3 to 5 days |
| Curing before normal use | None | 1 week |
| Full cure | None | 2 to 4 weeks |
| Total | 10 to 20 hours | 6 to 8 weeks |
If you want to eat at the table at Christmas, the slab needs to be in the house by early November. People order in December for Christmas and then try to compress the acclimatisation and the cure, which is exactly where the failures come from.
Where the waiting is not negotiable
- Acclimatising. Two weeks minimum, flat on battens, in the destination room. This is what stops the piece changing shape after it is built. See acclimatising a slab after delivery.
- Between finish coats. The recoat interval is on the data sheet and shortening it gives you a soft finish.
- Full cure. Weeks. The table can be used gently well before this, but hot plates and standing objects wait. See dry to touch versus fully cured.
Where you can save time
- Outsource the flattening. A workshop does in an hour what a router sled does in a day, including building the sled. Often the best single decision.
- Order the base early, as soon as you know the finished thickness, so it is not the thing you are waiting for at the end.
- Sand on a weekday evening in stages rather than needing one long block.
- Do the underside first, so the top face gets the cleanest conditions.
Where people lose time unexpectedly
- The slab does not fit through the door. Discovered on delivery day. Measure before ordering, using measuring your door and stairwell.
- The base arrives in the wrong height, because it was ordered before the slab was flattened.
- A cold garage, which turns a three-day finishing schedule into three weeks.
- Re-sanding after discovering swirl marks under the first coat, which costs a full day and is avoided with a work light.
A realistic schedule
- Week 0: shortlist, quote, order.
- Week 1: delivery. Get it flat on battens in the room. Order the base once you know the slab.
- Weeks 2 and 3: acclimatising. Nothing to do.
- Week 4: flatten, cut, prepare the edges.
- Week 5: sand, finish, coat by coat.
- Week 6: fit the base, put it in place, use it gently.
- Weeks 7 and 8: curing. Normal life resumes.
If you are paying a maker
Their working time is shorter because they have the machines, and the acclimatisation and curing clocks are identical. A maker who promises a finished slab table in two weeks from an unacclimatised slab is compressing the part that cannot be compressed. The mistakes that follow are in mistakes people make on a first slab.
Common questions
How long does it take to build a slab table?
10 to 20 hours of actual work, spread across 6 to 8 weeks, because acclimatising the wood and curing the finish take most of the calendar.
How long does a slab need to acclimatise?
At least two weeks flat on battens in the room where it will live, and longer in a very dry house.
Can I speed up a slab build?
Outsource the flattening and order the base early. The acclimatisation and the finish cure cannot be shortened without consequences.
When should I order if I want the table for Christmas?
Early November at the latest, so the slab has time to settle before you cut it and the finish has time to cure before the table is used.