Carrying and Lifting a Slab Safely

How many people, how to hold it, where it is weakest and the damage that happens in the last two metres.

Bases and engineering4 min readUpdated 2026-10-23

Most slabs that get damaged are damaged indoors, by the people who bought them, in the last two metres before the table base. Freight is well protected and well handled. A doorway with a 110 kg walnut slab and two tired people is not.

Know the weight before you lift

A 300 cm walnut slab at 6 cm thick is roughly 110 kg. Work out yours before delivery day rather than discovering it on the driveway. The calculation is in working out what a slab weighs.

WeightPeopleNotes
Under 40 kg2Awkward rather than heavy
40 to 80 kg2 to 3Three is much safer through doors
80 to 130 kg4One person at each corner, one calling the moves
Over 130 kg4 plus equipmentStraps, a trolley, or a panel lifter
Carry it on edge

A slab carried flat sags under its own weight and is enormously harder to hold. On edge, the same slab is a stiff beam and two people can manage what four would struggle with flat. Carry on edge, set down flat.

Where it is weakest

  • Across an existing crack or void. Carrying flat puts the crack in tension. On edge it is loaded the strong way.
  • Thin sapwood edges. The live edge can be thin and brittle at the extremes. Do not grip there.
  • Corners. A dropped corner takes the whole weight on a small area and crushes.
  • Any area already filled with resin. A fill is not structural, as covered in filling voids and knots with resin.

Before you pick it up

  1. Walk the route. Every doorway, every turn, the stairs, the light fitting at the bottom of the stairs. Measure the tight ones. See measuring your door and stairwell.
  2. Clear it completely. Rugs rolled, shoes moved, doors hooked open, coats off the hooks.
  3. Decide where it lands and put blankets and two battens there, so you can set it down and still get your fingers out.
  4. Agree who calls it. One voice. Lift on three, and everyone knows which three.
  5. Gloves. Grip matters more than anything else, and a rough-sawn edge will shred bare hands.

Through a doorway

On edge, lead with a corner, angle it through, and have one person inside pulling and one outside feeding. The person going backwards cannot see; the person going forwards calls the obstacles. This is where a third pair of hands pays for itself.

A 330 cm slab such as P-15 will not go round a 90 degree turn in a narrow hall. That has to be known before it arrives, not discovered.

Up stairs

Heavy end downhill, on edge, slow. The person below takes the weight and the person above guides and stops it sliding. Never have anyone below a slab on a staircase who is not actively holding it.

If the stairwell has a turn, measure the diagonal of the turn and compare it with the slab length. Many slabs that fit through the front door do not go up a turned staircase.

Setting it down

Two battens on the floor, at least 5 cm thick, so hands come out. Never set a slab down flat on a hard floor directly: you will trap fingers, and the corner takes the impact. Lower it on edge onto the battens, then tip it flat.

Never lean a slab against a wall unsupported for more than a few minutes. It slides, and a 110 kg slab sliding is dangerous. If it must stand on edge, support it at both ends and put something behind it.

Storing it before the build

Flat, on battens at even intervals, in the room where it will live. Not on edge for weeks, not against a radiator, not in a garage. The reasoning is in acclimatising a slab after delivery.

Equipment worth having

  • Lifting straps that pass under the slab and over the shoulders. Transform a four-person job into a two-person one.
  • A panel trolley or furniture dolly for long flat runs.
  • Moving blankets under everything.
  • Suction handles work on a smooth finished top, not on rough sawn timber.

Common questions

How many people to move a wood slab?

Two up to about 40 kg, three to 80 kg, four above that. A 300 cm walnut slab at 6 cm is roughly 110 kg, so plan for four.

Should you carry a slab flat or on edge?

On edge. Flat, it sags under its own weight and puts any crack in tension. On edge it is a stiff beam and far easier to hold.

How do you set a slab down without trapping fingers?

Put two battens at least 5 cm thick on the floor first, lower the slab onto them on edge, then tip it flat. Never lower it directly onto a hard floor.

Can I lean a slab against a wall?

Only briefly and only supported at both ends with something behind it. A heavy slab that starts sliding down a wall is dangerous.

Every slab here is the only one of its kind